Finance for Refurbishment and Repositioning
Refurbishing a building before reletting or selling it? See how the tenants who stay, the cost of works and the letting dates affect your funding options.
Discuss your refurbishment projectHow much work does the building need?
List what needs doing, which parts of the building stay let and when the empty space can earn rent. That helps a provider decide which type of refurbishment finance could fit.
-
Little or no work before letting
A mortgage on the building as it stands
- When it can fit
- The building can be valued and lent against today. The rent already paid supports the payments, and any works are modest enough to fund from company cash or phase around the tenants.
- What the lender looks at
- Current value, the rent under signed leases and the empty units. Expect a value with the space still empty and no allowance for the improvements yet.
- Main risk
- The loan is sized before the works add value, so your company pays for them. Check whether the lender must consent to the works.
-
Light, non-structural works
A bridge for light works and empty units
- When it can fit
- A term lender will not lend until the empty units are improved and let. Works are cosmetic or services upgrades, with no structural change or change of use.
- What the lender looks at
- The schedule of works and costs, who is doing them, the value after works and evidence that a mortgage or sale can repay the bridge.
- Main risk
- The full balance is due on a fixed date. Works, letting and the refinance all have to fit before it. The example below tests that.
-
Structural or extensive works
Finance tied to heavier works
- When it can fit
- The roof, structure, layout or main services are being replaced, often with building regulations approval or planning involved, but the use stays the same.
- What the lender looks at
- A costed programme, the contractor, the professional team and consents. Works money is often released in stages after the lender's surveyor inspects progress.
- Main risk
- Overruns and slow releases. Tenants may not be able to stay, so less income is left to cover costs. Keep a contingency.
-
Change of use or conversion
Staged conversion funding
- When it can fit
- The building becomes something else, such as offices into flats, often through a separate company. The finished units are sold or let.
- What the lender looks at
- Planning or prior approval, a full development appraisal, contractor payment dates and the developer's contribution and experience.
- Main risk
- Cash timing between contractor payments and draws. See finance for development and conversion companies.
Two questions place most projects. Does the use of the building change? If so, start with conversion funding. If not, could a lender lend on the building today, with the empty space empty? If it could, compare a mortgage now with a bridge. If it could not, the choice is between a bridge for light works and finance tied to heavier works, depending on the scope.
Two suites let, two empty: does the timetable fit the bridge?
Illustration only. A property company owns a freehold office building in England with four suites. Its £470,000 loan is up for renewal and the current lender will not fund works. The building is assumed to be worth £1,200,000 as it stands and £2,000,000 once improved and fully let.
Suite A
£45,000 a year
Let. The tenant stays during the works.
Income keptSuite B
£45,000 a year
Let. The lease runs well past the bridge.
Income keptSuite C
£0 today
Empty, EPC F. Expected £50,000 a year after works.
Cannot be let yetSuite D
£0 today
Empty, EPC F. Expected £50,000 a year after works.
Cannot be let yetIn England and Wales a landlord generally must meet the applicable minimum energy efficiency standard or register a valid exemption before granting a new lease of a covered F- or G-rated property. Phase 1 upgrades heating, lighting, insulation and the fit-out of Suites C and D for £300,000. Phase 2 refreshes the common parts and roof plant for £100,000 while all tenants stay. Neither phase is structural or changes the use.
The company takes a 15-month bridge. On day one, £500,000 repays the old loan and £30,000 of costs. A £400,000 works facility is released in three stages after the lender's surveyor inspects. Rent from Suites A and B pays the monthly interest. The company pays the contingency, professional fees, letting costs and empty-unit costs.
Cost and timetable on the same forecast
| Months | Bridge owed at the end | Company cash used so far |
|---|---|---|
| Month 0 Bridge repays the £470,000 loan and £30,000 of costs | £500,000 | £0 |
| Months 1–3 Phase 1 starts on the empty suites. First stage released after inspection | £650,000 | £13,500 |
| Months 4–6 Phase 1 finishes and new EPCs are issued. Second stage released | £800,000 | £40,600 |
| Months 7–9 Agents market Suites C and D. Phase 2 starts. New leases signed at the end of month 9 | £800,000 | £76,300 |
| Months 10–12 Phase 2 finishes, final stage released. A term mortgage repays the bridge in month 12 | £900,000, then repaid | £104,600 |
The timing test
Bridge must be repaid by
Month 15Assumed time to refinance after leases are signed
3 monthsLatest date to sign the new leases
Month 12The base case assumes signed leases at the end of month 9 and a completed refinance at the end of month 12, three months before the bridge is due. Each delay below is tested against the same deadline.
| Change to the plan | Refinance completes | Time left before month 15 |
|---|---|---|
| Plan as forecast | Month 12 | 3 months |
| Phase 1 finishes two months late | Month 14 | 1 month |
| Letting takes three months longer | Month 15 | None |
| Both happen | Month 17 | 2 months short |
Each month that Suites C and D stay empty after the final draw costs the company about £2,700: £7,500 of rent from Suites A and B, less £7,200 of interest and £3,000 of empty-unit costs. If both delays happen, the bridge reaches its end date before a mortgage can repay it. An extension needs the lender's agreement and is not assured.
Will the refinance lender count the new leases?
Counts signed leases
£190,000 rent supports £1,900,000, so the assumed 65% value limit applies: 65% × £2,000,000
£1,300,000
Counts only rent being paid
£90,000 ÷ (125% cover × 8% assumed rate) while Suites C and D are rent-free
£900,000
On the second reading the new mortgage only just matches the £900,000 owed, with nothing spare for any shortfall. Ask the refinance lender early how it treats a lease still in its rent-free period and what evidence of completed works it needs.
- Cost a term that covers both delays, then compare it with the cost and uncertainty of an extension.
- Market Suites C and D during Phase 1. An agreement for lease signed before the works finish can bring the refinance forward.
- Move Phase 2 out of the bridge if letting does not depend on it, and pay for it from the refinance or company cash. Check whether moving Phase 2 would reduce the bridge balance before refinancing.
What to settle before the works start
The scope of works
Write down each item, its cost and whether it touches the structure, roof or main services. Ask each lender how it classifies the scheme. A loan agreed for light works may not permit heavier ones, so agree changes before you start them.
Tenants who stay
Check what the leases say about access, noise, services and service charges during works. Show the lender which rent continues, and plan works so that the tenants can keep trading.
Empty units and energy ratings
Get current EPCs for each unit you plan to let. Price the improvements needed to reach the standard, or take advice on whether an exemption applies. Exemptions may not pass to a new owner on sale. The government has consulted on higher future standards, so check the current position.
Contractor and programme
Lenders review who is doing the work, the price, the programme and how stage payments line up with releases. A fixed price still leaves your company paying for changes it asks for.
Consents
Works may need planning permission, building regulations approval or listed building consent. Your existing lender, a superior landlord or a tenant may also need to agree. Ask a professional to confirm which consents apply and show the lender the evidence.
Release and exit
Get the release schedule in writing: what the surveyor must confirm and how long payment takes. For a refinance, find out what the lender will need to see before it offers. For a sale, back the price with local evidence and allow for a slower sale.
For general structures and costs, see development and refurbishment finance for repositioning projects, bridging finance for refurbishment and repositioning and commercial mortgages after refurbishment. The bridge versus mortgage guide compares the two structures in general. If the works add up to a conversion or new build, compare property development finance. If the building is let without works, the mixed-use and commercial investments overview covers which rent lenders count. Refurbishing premises your own business trades from? See finance for owner-occupied business premises. For other ownership models, return to commercial property and asset ownership.
Questions about refurbishing and repositioning a building
Can we get a commercial mortgage on a building that still needs work?
Sometimes, if a lender will value and lend on the building as it stands. Ask which valuation basis and rent the provider will use, including how it will treat any empty space. Your company then funds the works itself, and the lender may need to consent to them. Ask what the lender would offer today and compare the shortfall against your cash for the works.
What counts as light or heavy refurbishment?
Each lender sets its own definition. Light usually means non-structural work such as decoration, new kitchens, lighting or services upgrades. Heavy usually involves structural change, extensions, roof work or major reconfiguration, and often needs building regulations approval. Describe the actual works to the lender rather than choosing a label, and confirm in writing that the facility covers the full scope.
Can tenants stay in the building while the works happen?
Often, if the works are phased around them and the leases allow it. Their rent can help cover interest, as in the example. Check the leases for access, services and service-charge terms, and agree working hours and safety arrangements with the contractor. Tell the lender which tenants will stay and whether any could leave because of the disruption.
Can we relet an empty unit rated EPC F or G?
In England and Wales, generally not on a new lease unless it reaches at least EPC E or a valid exemption is registered. Check whether the rules apply to your building and lease. Get a current EPC and price the improvements before setting the works budget. Check the equivalent rules elsewhere in the UK.
How long should a refurbishment bridge run?
Long enough for the works, the letting or sale, and the refinance, even if two of them run late. In the example, the plan leaves three months spare, but a two-month works overrun plus a slow letting leaves the company two months short. Add up each stage, test the delays and set the term from that case. Then confirm the cost of the longer term.
What should we bring to a first enquiry?
Bring the address, the current value and debt, or the purchase price. Add the schedule of works with costs, the contractor if chosen, and the consents position. Include a tenancy schedule showing which units stay let, current EPCs, the letting or sale plan and your timetable. Estimates are fine to start. Lenders will ask for reports and documents later.
Bring the works budget, the tenancy position and the dates
Tell us which company owns or is buying the building, what work is planned and what it costs, which units stay let, and how the loan would be repaid or refinanced. NBS Finance is a commercial finance broker and introducer. Providers assess the property, the works and the borrower, and set any offer, fees, security and guarantees. Property used as security may be repossessed if repayments are not made.
Start a refurbishment finance enquiry