Bridging Finance for Refurbishment and Repositioning

Bridging a building for light works, then finding structural problems? See what to tell the provider, how works money is released against contractor bills and when to rethink the exit.

Discuss a refurbishment bridge

When the light works turn structural

A refurbishment bridge is short-term borrowing secured on the building, agreed for a set scope of works. Lenders decide for themselves what counts as light or heavier work. Some light-works products exclude structural work altogether, so a bigger scope found halfway through is a question for the provider, not just the contractor.

Illustration only. A property company owns a vacant two-storey showroom with offices above in England. Its 12-month bridge was agreed for £160,000 of light works: new heating and lighting, decoration, flooring, WCs and glazing repairs. In month 2 the strip-out exposes rotten first-floor joists and a cracked lintel over the shopfront. The agent also reports that the most likely tenant wants the ground floor opened up, which means removing a load-bearing wall.

  • Scope agreed for the bridge Light, non-structural works

    £160,000

  • Scope after the strip-out Light works plus two structural items

    £232,000

  • Original light works £160,000
  • Joist and lintel repair £38,000, needed
  • Removing the wall £34,000, tenant’s request

The structural engineer and building control add £8,000 of fees, on top of the original £12,000 of professional fees. The repair cannot be avoided. Removing the wall is a choice that could help the letting.

Pause the structural items and write to the provider before they start. Starting structural work that the facility does not cover could put the loan in breach. Check the facility letter for the permitted works, and send the provider the engineer’s findings first.

Two ways to put the new scope to the provider

In this example, the provider offers two options. It will consent to the repair under the existing facility, without funding it. Or it will re-underwrite the full scope as heavier works, with a new valuation and a monitoring surveyor. Both routes are assumptions to show the trade-off.

Hypothetical comparison. Works money is released at 75% of the cost the surveyor confirms, in arrears.
What changes A. Repair only, with consent B. Full scope, re-underwritten
Works carried out Light works and the repair. The wall stays. Light works, the repair and the wall removal
What the provider needs Engineer’s report, priced repair, building control approval and a written consent All of A, plus a new valuation, a monitoring surveyor and a varied facility
Works money released £120,000 75% of the original £160,000 only £174,000 75% of £232,000
Company cash for works and fees £99,500 includes £1,500 consent and legal costs £87,580 includes £9,580 for revaluation, legal, monitoring and fees
Bridge balance to repay £640,000 £694,000
Months spare before the bridge is due 1 month works finish one month late None one month for approvals and one month more of works
Assumed refinance at 65% of let value £650,000 a different tenant at £78,000 a year, value £1,000,000 £715,000 the tenant who asked, at £85,000 a year, value £1,100,000
Margin before refinance costs £10,000 £21,000
Both balances start from a £520,000 day-one advance and assume the company pays the monthly interest separately. That interest is not in the cash figures. Route B carries up to £54,000 more debt and runs one month longer. At an assumed 0.8% a month that adds roughly £8,000 of interest, so most of its £11,920 cash saving goes. The rents, values and 65% figure are assumptions, not lending criteria.

Route B uses less cash before interest and gives more room at exit, but only if the tenant signs and the provider extends the term as part of the same variation. Route A keeps the debt and dates closer to the original plan, but it relies on finding a tenant who accepts the existing layout. If the provider will not re-underwrite, a third option is to refinance onto a heavier-works facility elsewhere. That means a new valuation, legal and arrangement costs, and any exit fee on the current bridge.

Works releases are not the same as the contractor’s bills

A refurbishment provider usually releases works money after its surveyor confirms what has been done, so the company pays the contractor first and is partly repaid later. In route B, releases cover 75% of the confirmed works. Fees, monitoring visits and the variation costs come from company cash in full.

Route B, hypothetical. The company pays each bill when due, and the release arrives after the next inspection.
Stage Company pays Released after inspection Company cash used
Months 1–2 Strip-out and first fix: £64,000 works, £6,000 fees, £1,000 inspection £71,000 £48,000 £23,000
Months 3–5 Approvals, then repair and wall removal: £72,000 works, £8,000 engineer and building control, £6,580 revaluation, legal and fee, £1,000 inspection £87,580 £54,000 £56,580
Months 6–7 Second fix, finishes, WCs and glazing: £96,000 works, £6,000 fees, £1,000 inspection £103,000 £72,000 £87,580
Total £261,580 £174,000 £87,580

Company cash used once works finish

£87,580

Most cash out at one time, before the last release

£159,580

Final release that reduces it

£72,000

The company needs £159,580 available during months 6 and 7, not just the £87,580 it uses in the end. Ask the provider how long a release takes after an inspection. Ask whether the contractor will accept payment dates tied to those visits. Materials that are not yet fixed, and work the surveyor thinks is unfinished, may wait until a later release.

What the bridge provider will ask for

The engineer’s findings

A structural engineer’s report on the defect, the repair design and whether anything else in the building is affected. Photographs from the strip-out help the provider’s surveyor.

A priced, revised schedule

The contractor’s price for each new item, set out separately from the original light works. Mark which items are needed and which are optional, such as the wall removal.

Building regulations and other consents

Building regulations approval is separate from planning permission, and you may need both. Structural repairs and removing a load-bearing wall are likely to need approval. Check with a building control body, and show the provider the application or approval.

A revised programme and term

The new finish date, and when the letting and refinance are now expected. If the time left is thin, ask for any term change at the same time as the scope change.

Value and letting evidence

The provider may want a new valuation of the building as it stands and after the works. Heads of terms or an agent’s letter showing that the tenant’s interest depends on the open-plan layout support route B.

Cash and insurance

Bank evidence that the company can carry its share, including the peak before each release. The provider may also ask to see the contractor’s insurance for the structural work.

When to reconsider the exit

A scope change can affect the repayment as well as the cost. Recheck the exit as soon as the new scope is priced, and before you agree to it.

  • The time left falls below what a fallback needs

    With no months spare, a slow letting or valuation pushes the refinance past the due date. Agree the term with the variation, or set a date to prepare a sale.

    Route B: none spare
  • The margin is close to the refinance costs

    A margin of £10,000 leaves little room once valuation, legal and arrangement costs are paid. A small fall in value could leave a shortfall.

    Route A: £10,000 before costs
  • The letting depends on the change

    If the likely tenant only signs for the open-plan layout, route A also needs a different tenant. Get the agent’s view in writing before choosing.

    Rent assumed £78,000 or £85,000
  • The provider’s valuer marks the building down

    Exposed defects can lower the current value as well as raise the cost. Ask whether a new valuation changes the day-one advance or the release terms.

    Ask before the revaluation

If the building is let without works and the question is only refinance or sale, see bridging finance for mixed-use and commercial investments. Works planned in phases with tenants in place are covered by development and refurbishment finance for repositioning projects. For the long-term loan after the works, see commercial mortgages for refurbished buildings. If the use of the building changes, compare finance for conversion companies. The refurbishment and repositioning overview compares the routes by the severity of works. The general commercial bridging finance and property refurbishment finance guides cover interest, security and costs.

Questions about refurbishment bridges and changes of scope

Can a light refurbishment bridge pay for structural work?

Only if the provider agrees. Some light-works products exclude structural work, and each lender sets its own definitions. Describe the actual works and ask for written confirmation of what the facility covers. If structural work becomes necessary, the provider may consent, re-underwrite the loan on heavier-works terms or decline, in which case you would need another facility.

What should we do if the strip-out uncovers a structural problem?

Make the area safe, pause the structural item and tell the provider in writing before the repair starts. Get a structural engineer’s report and a price from the contractor. Then ask the provider which option it will consider and what evidence it needs. Keep the light works going only if the facility and the contractor allow it.

What evidence will the provider need for a change of scope?

Expect to send the engineer’s report, a revised and priced schedule of works, the building regulations position, a revised programme and evidence of the company’s cash. The provider may also want a new valuation, letting evidence and the contractor’s insurance. Its surveyor may visit before any change is agreed.

Why are works releases lower than the contractor’s bills?

The agreement sets which work is eligible, what evidence it needs and how much the provider will release. Check whether fees, unfixed materials or work still in progress can be included. In the example, £261,580 of bills brings £174,000 of releases, and the company carries up to £159,580 before the last one. Budget for the most cash you need before a release arrives.

When should we rethink how the bridge will be repaid?

As soon as the new scope is priced. Check the months left before the due date, the bridge balance against a likely refinance or sale, and whether the letting depends on the change. If the time left is gone, agree a term change with the variation. An extension needs the provider’s agreement and is not assured, so do not rely on one.

What should we bring to a first enquiry?

Bring the address, current value and bridge statement, the facility letter and original schedule of works. Add the engineer’s findings, the contractor’s revised prices, the building regulations position and your new programme. Include the letting plan and agent’s advice, and how much cash the company can add. Estimates are fine to start.

Bring the facility letter, the new scope and the dates

Tell us which company owns the building, what the bridge was agreed for, what the strip-out found, the revised costs and how the bridge will be repaid. NBS Finance is a commercial finance broker and introducer. Providers assess the property, the works and the borrower, and set any offer, fees, security, guarantees and repayment date. Property used as security may be repossessed if repayments are not made.

Start a refurbishment bridge enquiry