Commercial Mortgages for Refurbishment and Repositioning

Works nearly finished and a bridge to repay? See which new rents a term lender may count, how unfinished space affects the valuation and how big the cash gap could be.

Discuss a post-works mortgage

Which new rents can the term lender count?

A commercial mortgage after refurbishment depends on the property, leases and remaining works that the lender assesses at valuation. Each unit's position matters. A unit may have a tenant paying rent, a signed lease still in its rent-free months, or only agreed heads of terms with works still to finish. Some providers use the lower of the lease rent and the valuer's market rent. Some also look closely at incentives such as rent-free periods. Here is an illustrative refurbished building with one unit in each position.

£27,000 a year

Unit 1: trade counter

New 10-year lease. The tenant has paid two quarters, and the receipts match the lease.

Lease signed, rent being paid

£18,000 a year

Unit 2: first-floor office

New 5-year lease with six months rent-free. The first rent payment is due in four months.

Lease signed, rent-free

£13,500 a year

Unit 3: first-floor office

Heating and fire alarm works are unfinished, with no building control sign-off. Heads of terms are agreed, but no lease is signed.

Works and lease outstanding
  • Only rent being paid Unit 1

    £27,000 a year

  • All signed leases Units 1 and 2, including the rent-free lease

    £45,000 a year

  • Every unit, once finished and let Units 1, 2 and 3

    £58,500 a year

Hypothetical rents. The example assumes the valuer agrees each lease rent is at market level. If a valuer judged a rent too high for the incentives given, the lender could count less.

Size the mortgage against the bridge redemption figure

Illustration only. A property company bought a dated trade counter and office building in England with a bridging loan and split it into three refurbished units. The bridge redemption figure is £560,000 on its repayment date. Term mortgage costs (valuation, legal and arrangement) are assumed at £9,000, so £569,000 is needed to complete. The company holds £40,000, of which £22,000 is committed to finishing Unit 3. The assumed lender lends the lower of 65% of the valuation and the amount the counted rent covers 150% of interest at 6%.

Strict: paid rent only

Refinance now

Rent counted
£27,000
Rent ceiling (÷ 0.09)
£300,000
Value ceiling, 65% × £820,000
£533,000
Loan: the lower figure
£300,000
Bridge plus term costs
£569,000

Gap: £269,000

Signed leases counted

Refinance now

Rent counted
£45,000
Rent ceiling (÷ 0.09)
£500,000
Value ceiling, 65% × £820,000
£533,000
Loan: the lower figure
£500,000
Bridge plus term costs
£569,000

Gap: £69,000

Every unit finished and let

After a four-month bridge extension

Rent counted
£58,500
Rent ceiling (÷ 0.09)
£650,000
Value ceiling, 65% × £950,000
£617,500
Loan: the lower figure
£617,500
Extended bridge plus term costs
£593,800

Margin: £23,700

The valuer is assumed to put £820,000 on the building with Unit 3 empty and unfinished, and £950,000 once all three units are finished and let. Refinancing now on signed leases leaves a £69,000 gap. After the £22,000 for Unit 3's works, the company has £18,000 towards it, so £51,000 must come from elsewhere. Waiting means extending the bridge for four months, at an assumed £4,800 a month of rolled-up interest plus a £5,600 extension fee. That adds £24,800, taking the redemption figure to £584,800, and the larger loan then covers it with £23,700 to spare.

Hypothetical figures, not lending criteria, valuations or an offer. The 65%, 150% and 6% figures, the extension terms and every valuation are assumptions. The rent test uses interest only. Each provider sets its own rent basis, cover level, stress rate and valuation approach. The third column assumes Unit 2's rent-free period has ended and the lender counts Unit 3's signed lease once its works are certified complete. A bridge extension needs the bridge lender's agreement and is not guaranteed.

What a slipping works programme does to the margin

Waiting only works if Unit 3 is finished, signed off and let within the extension. In this example each further month of delay adds another assumed £4,800 of bridge interest, and the £23,700 margin shrinks like this:

  1. 1 month late

    £18,900

  2. 2 months late

    £14,100

  3. 3 months late

    £9,300

  4. 4 months late

    £4,500

  5. 5 months late

    £300 short

Before any further extension fee, which this example does not model. A second extension may not be offered at all.

A plausible decision for this building

  1. Ask each term lender how it treats every unit before paying for a valuation. Ask whether it counts a signed lease that is still rent-free, whether it counts heads of terms, and whether the works must be certified first. The answer decides which column above applies.
  2. Price the extension in writing before relying on it. Get the bridge lender's monthly cost, fee and latest date. Then compare that with finding £51,000 to refinance now on the signed leases.
  3. Protect the Unit 3 programme. Book the building control inspections, confirm when the contractor will finish and get the tenant's solicitor working on the lease while works continue. The margin covers about four months of further delay.
  4. Keep the directors' fallback specific. If neither route works, decide who would provide the gap, on what terms, and what guarantees each lender requires.

If works are still substantial, the bridge or a works facility may be the right product for now. Compare bridging finance for refurbishment and repositioning and development and refurbishment finance for repositioning projects for that stage. The bridge versus commercial mortgage guide covers the general choice.

Evidence that turns new rent and finished works into value

The valuer and the lender need proof of what has changed since purchase. Gather it while the works finish, not after the bridge falls due.

Works finished and signed off

  • The schedule of works, its status by unit and the contractor's final account or cost to complete.
  • Building control completion certificates for notifiable work. A council says these are needed when re-mortgaging and evidence no outstanding requirements.
  • Planning permission or other consents for any change of use, with conditions discharged.
  • Energy performance certificates after the works. Let commercial space in England and Wales generally needs at least an E rating unless an exemption is registered. Some lenders ask for more.

Leases and rent

  • Signed leases, with any rent-free period, stepped rent, break and side letter shown.
  • Heads of terms for unlet units, and how far each lease has progressed.
  • Rent receipts matched to each lease, and the date the first rent is due under each rent-free lease.
  • A tenancy schedule with lease end dates against the proposed mortgage term.

Value and the debt to repay

  • Recent lettings and sales of comparable refurbished space that support the new rents and value.
  • Purchase price and date, and total spent on works, with invoices.
  • The bridge redemption statement, its repayment date and its extension terms.
  • Company accounts, directors' assets and liabilities, and other properties and debts.

Published examples of term finance after works

  • Shawbrook has published a case where an investor bridged a vacant semi-commercial building needing refurbishment, then refinanced onto a semi-commercial loan after a new valuation, once the units were let.
  • Yorkshire Building Society has published a refinance on a former office converted into flats, completed after the conversion finished.
  • Trade press reported an LHV Bank five-year term loan on an income-producing office that included six months interest-only while vacant floors had light refurbishment.

These are the providers' own accounts or press reports. They do not describe NBS involvement and do not set terms for any other case.

For a let building with no works planned, see commercial mortgages for mixed-use and commercial investments. The refurbishment and repositioning overview compares funding across the project. The general commercial mortgages guide and the commercial property finance guide cover structures, costs and security. For other ownership models, see commercial property and asset ownership finance.

Questions about mortgages after refurbishment

When can a refurbished building move onto a commercial mortgage?

Usually when the works are finished and signed off, leases are signed and the valuer can value the building as it now stands. Some lenders also want rent to be paid before they count it. Check how each lender treats rent-free leases, heads of terms and outstanding works, and count back from the bridge repayment date to allow time for valuation and legal work.

Will the lender count rent from a lease that is still rent-free?

It depends on the lender. Ask whether the lender will count a signed lease during its rent-free period, wait for first payment or reduce the rent figure to reflect incentives. A valuer may also decide that a rent agreed with generous incentives is above market. Show the lease, the date of the first rent payment and how the incentives compare with similar lettings.

Can we get a term mortgage before the works are finished?

Sometimes, but expect the valuation and the counted rent to reflect the building's current state. The lender may offer less until the remaining work is signed off or the unit is let. One published case involved a term loan on an income-producing office that included an interest-only period for light refurbishment of vacant floors. Ask the lender whether outstanding works are acceptable and on what valuation basis.

What evidence supports the higher value after refurbishment?

Signed leases, rent receipts and recent comparable lettings and sales of refurbished space carry the most weight. Provide completion certificates, updated energy certificates, consents and the final works costs. A valuer decides value on its own evidence. Spending money on the building does not automatically add the same amount to its value.

What if the mortgage is smaller than the bridge redemption figure?

The company must pay the difference and the completion costs, or the refinance cannot complete on those terms. Options include directors' money, waiting for more rent to count, or asking for a bridge extension. An extension needs the bridge lender's agreement and is not a repayment plan in itself, so price it in writing before relying on it.

What should we prepare for a first enquiry?

Give the address, the company that owns it, the purchase price and date, total works spend and what remains. Add the bridge redemption figure and its repayment date. List each unit with its lease status, rent, rent-free period and works status. Rough figures are fine to start, but bring the leases and completion certificates as soon as they exist.

Bring the unit schedule and the redemption date

Tell us what the works have changed, how each unit is let or progressing and the figure you need to repay. NBS Finance acts as a commercial finance broker and introducer. Providers assess the property, leases and borrower, and set any offer, fees, security and terms. Property used as security may be repossessed if repayments are not made.

Start a post-works mortgage enquiry